Kitchen deck & perimeter foundation

August 2015 - Foundation & deck are done!  Very solid.  Our local hero, Duane, did a beautiful job.  We retained & enhanced the rock walkway Susan installed 18 years ago & rip-rapped the corner to prevent sloughing.

Job entailed:

  • Place 40 feet of perimeter concrete foundation.
  • Re-install half-log skirting.
  • Construct new deck on east side
  • Install 3 support piers under fire place area.
  • Place concrete water heater enclosure.
  • Install redwood 4x6 at front porch and shed roof.
  • Install new flashing and threshold at kitchen door.

Not done as of 9/2015:  Replace kitchen door -  We keep repairing it but the upper window can't slide any more (springs fell out so it is screwed in place).  It's very weathered due to many years without paint although I try to keep it painted now.  